Measure the mold plates and support pillars etc, and make sure all the components are within tolerance
Prepare for shipping
Finalization is an end process by our quality team to make sure everything is ready for shipping and meets all the customer requirements and specifications.
Final Mold Test
Accordino to the customers reourement for the radius on soure. we measure the spherca radius and make sure it suitable for the dlient iniection machine
Ejection test
We use mechanical, hydraulic press, injection machine and overhead crane to lift down to test and see if the ejector pins can be moved smoothly, then use 0.02mm fin foil to detect stop pins with red/blue painting, if they can move smooth and see the red/blue painting even, which means OK.
Cooling line testing
We measure the water amount and leakage, use the pressure gauge and set it with four kilograms of pressure and keep it for four minutes without leaking. Use the flow meter to measure the flow, the flow shows 2.0 or more are OK, the higher the better.
Documentation
Complete documentation, 2D Mold Drawing and 3D Mold Drawings, trial parameters, trial video, material certifications, Dimensional Report
Final Mold Test
Depending on customer requirements we can run the tool for up to 3 hours before shipping (with resin supplied)
Specifications
Quality team will review the original customer specifications to ensure all requirements have been met
Packaging
Vacuum sealed and customized shipping container to prevent damage during shipment.
CONTACT US
Add.: Chikan Village, Shipai Town,
Dongguan City, Guangdong
Province, China
Contacts: Selina Hong
Mobile:+86-13532891425
Fax: +86--769-86537191
E-mail: admin@dxmold.com
CONTACT US
CAPABILITIES
DFM & Mold Design
Project Management
Mold Manufacturing
Mold test verification
Quality Control
Mold inspection & documentation
PRODUCTS
Mold Display
Product Display